Registration documents
Everything your regulator will ask for.
What each document is, who issues it and how long it takes, so you can plan a registration before you place the first order.
01The set
Ten documents, most already on file.
| Document | Issued by | What it is | Lead time | Scope |
|---|---|---|---|---|
| Certificate of Pharmaceutical Product (CoPP) | DRAP, WHO format | Confirms the product is registered and manufactured under GMP in Pakistan; names the importing country. Most regulators ask for it first. | 3–6 weeks from application | Per product, per importing country |
| Free Sale Certificate (FSC) | DRAP | States that the product is freely sold in Pakistan. Asked for by some markets instead of, or alongside, the CoPP. | 2–4 weeks | Per product or product list |
| GMP certificate | DRAP | Certificate of Good Manufacturing Practices for the Islamabad plant, GMP/C/000154/112026, valid to 5 November 2029. | On file — same day | Site-wide |
| Drug Manufacturing Licence | DRAP | DML 000439, renewed to 3 October 2029; lists the sections the plant is licensed for. | On file — same day | Site-wide |
| Certificate of Analysis (CoA) | Paramount QC laboratory | Test results for the batch against its specification: assay, dissolution, impurities, microbiology as applicable. Ships with every batch. | With each batch | Per batch |
| Stability data | Paramount QC laboratory | Long-term and accelerated stability studies supporting the registered shelf life; zone IVb data for hot-humid markets on request. | On file for registered products | Per product |
| Product dossier (CTD) | Paramount Regulatory Affairs | Modules 1–5 in Common Technical Document format, adapted to the importing country's checklist (ASEAN, EAC, GCC and national formats). | 2–8 weeks depending on format | Per product, per market |
| ISO certificates | TÜV AUSTRIA CERT | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 for the manufacturing of pharmaceutical products (oral and topical). | On file — same day | Site-wide |
| Legalisation / apostille | Ministry of Foreign Affairs, embassy | Attestation of DRAP certificates for markets that require it. We handle the chain in Islamabad. | 1–3 weeks | Per document |
| Artwork and labelling files | Paramount | Print-ready carton, label and leaflet files in your language and format, with the registered text. | 1–2 weeks after approval | Per product, per market |
Lead times are typical for DRAP and Paramount and vary with the regulator’s workload. The current certificates can be viewed on the certifications page.
02How it works
One request, one contact.
01
Tell us the market and products
Your regulator’s checklist if you have it; otherwise we use the format that market usually accepts.
02
We confirm the list and timeline
Which documents are on file, which must be applied for, and the legalisation route for your country.
03
Applications go in
CoPP, FSC and attestations are filed in Islamabad by our regulatory affairs team; you get the reference numbers.
04
Dossier assembled
CTD modules adapted to your format, artwork in your language, samples dispatched for your lab if required.
Planning a registration? Start with the list.
Send the market and the products; the export team replies within one working day with the document set and timeline.