Export fast-track
A product for your market, registered in about a month.
Pakistan’s regulator, DRAP, currently grants export registrations for products made against export orders in roughly a month, instead of the standard queue. So a formulation developed for your market can be registered, manufactured in our DRAP GMP plant and shipped far sooner than a new product normally takes.
01How it works
Five steps from brief to shipment.
01
Brief and order
Formulation or reference product, market, pack, volumes, and a PO or letter of intent.
02
Development
Formulation, analytical method and stability batches in our R&D and QC laboratories; technology transfer if the product already exists.
03
Fast-track application
Export-only registration filed with DRAP by Paramount Regulatory Affairs, against your order.
04
Registration, about a month
DRAP's current processing time for export-only products developed against export orders.
05
Manufacture, release, ship
GMP batches, Certificate of Analysis, CoPP and export documents, dispatch to your forwarder.
02Why it matters
Months saved, not weeks.
~1 month
DRAP processing for export-only registrations developed against export orders, against a standard queue measured in many months.
266
formulations already registered and in production, so most requests are a strength, pack or combination away from an existing process.
5 sections
including a segregated cephalosporin section, all under one GMP certificate valid to 2029.
Pakistan's Drug Regulatory Authority currently processes registration applications for products made exclusively for export, against a confirmed export order, on a separate, shorter track — in practice about a month instead of the standard queue.
Describe the formulation. We’ll confirm the route.
Reference product or composition, market and volumes. Feasibility and the registration route within one working day.